Has anyone in here used to cost plus method with a builder to build a spec house? I’m considering it with a small house which I will either keep as a rental or try to sell as a spec if the market is still hot when it’s completed. The house will only be modest construction and be between 900-1200 SF and I anticipate a fee of between 15-20%.